Concrete structure
Concrete poured for the top floor
Concrete for the top floor was pumped into place, and every load was tested for quality.

One of two facing buildings in the First District of Bait Al Watan, joined to D110 by a large decorative arch. It has apartments from 140 to 213 m² and a garden apartment.
Last updated:
Concrete structure
Concrete for the top floor was pumped into place, and every load was tested for quality.
Concrete structure
Concrete trucks bring ready-made concrete to the site to finish the building's structure.
Concrete structure
Concrete was poured for the third floor of D111 as part of building its structure.
Our specifications
Our sales team is ready to help you choose the right unit and arrange a site visit.
Leave your name and number and our sales team will call you, or chat with us on WhatsApp.
Contact us on WhatsApp