Skip to content
AL QASRDEVELOPMENTS
Under construction

Bait Al Watan

Bait Al Watan, New Cairo

In the heart of New Cairo, between Al Rehab and Madinaty, with direct access to Mohamed Bin Zayed Axis and Suez Road, so residents reach key places and services easily.

Highlights

  • Prime location
  • Easy access
  • Premium surroundings
  • Distinctive architecture

Project facts

Area
New Cairo, between Al Rehab and Madinaty
Districts
First and Second District
Architecture
Elegant classic-style fronts
Unit types
Apartments, garden apartments, duplexes
Buildings
C38 · C39 · D110 · D111 · J159
Last updated

Buildings in this project

  • C38Under construction

    First District

    C38

    A residential building in the First District of Bait Al Watan, with an elegant classic-style front and a blue sloping roof. It has apartments, garden apartments and ground-floor duplexes, and is the twin of C39.

    Overall progress85%
    Current stage
    Façades
    Last updated
    View building
  • C39Under construction

    First District

    C39

    A residential building in the First District of Bait Al Watan, the twin of C38 with the same design and unit layouts: apartments, garden apartments and ground-floor duplexes.

    Overall progress80%
    Current stage
    Façades
    Last updated
    View building
  • D110Under construction

    First District

    D110

    One of two facing buildings in the First District of Bait Al Watan, joined to D111 by a large decorative arch. It has apartments, a garden apartment and a duplex.

    Overall progress70%
    Current stage
    Concrete structure
    Last updated
    View building
  • D111Under construction

    First District

    D111

    One of two facing buildings in the First District of Bait Al Watan, joined to D110 by a large decorative arch. It has apartments from 140 to 213 m² and a garden apartment.

    Overall progress68%
    Current stage
    Concrete structure
    Last updated
    View building
  • J159Under construction

    Second District

    J159

    A residential building in the Second District of Bait Al Watan, with a modern classic-style front and balconies with plants.

    Overall progress70%
    Current stage
    Façades
    Last updated
    View building

Location on the map

Bait Al Watan
North House
  • Bait Al Watan
  • North House
Press a building’s name or pin to fly to it, then drag the map to move around.

From the site

The project's location in the First District of Bait Al Watan

Our specifications

Specifications built to last

Building specifications

  • Built to the engineers' recommendations
  • Soil testing
  • Waterproofing
  • Ready-mix concrete
  • High-quality steel bars
  • Water pumps and drainage
  • Rainwater drainage system
  • High-quality plastering
  • Standard electrical and drainage connections
  • A defined timeline for every project

Security & safety

  • Security doors
  • Garage doors
  • Luxury elevators
  • Video intercom
  • Roof access door
  • Security cameras

Extra features

  • Drain pipes for air-conditioner water
  • Flat ceilings without beams
  • Guard room with a private bathroom
  • Multipurpose room
  • Places for outdoor air-conditioner units

Luxury specifications

  • Elegant classic-style fronts
  • Entrances finished in marble and granite
  • Modern-style entrances
  • Landscaping for every project
  • High-quality parking garage
  • Heat- and moisture-resistant paints
  • Aluminium windows that keep out heat and noise
  • Shared satellite dish
  1. FaçadesBait Al Watan · C38

    C38's front is finished

    The front of C38 is finished, with its blue sloping roof, decorative trim and balcony railings. Work continues on the outer walls and entrances.

    • The front of C38
      The front of C38
  2. Concrete structureBait Al Watan · D110 · D111

    Concrete poured for the top floor

    Concrete for the top floor was pumped into place, and every load was tested for quality.

  3. Concrete structureBait Al Watan · D110 · D111

    Concrete trucks arriving on site

    Concrete trucks bring ready-made concrete to the site to finish the building's structure.

  4. FaçadesBait Al Watan · C38 · C39

    Finishing the outside of the buildings

    Work on the outside of both buildings is moving ahead: the decorative trim, the balcony railings and the sloping roof are being fitted.

    • Finishing the outside
      Finishing the outside
    • Work on the outside of the buildings
      Work on the outside of the buildings

Every visit to Al Qasr starts a dream that becomes real

Our sales team is ready to help you choose the right unit and arrange a site visit.

Ask about this unit

Leave your details and our sales team will send you everything about this unit.

By sending your details you agree that the Al Qasr team may contact you about your request. Privacy policy

Or ask about it on WhatsApp

Request received

Thank you. We have received your request and a member of our sales team will contact you shortly.