Concrete structure
Concrete poured for the top floor
Concrete for the top floor was pumped into place, and every load was tested for quality.

One of two facing buildings in the First District of Bait Al Watan, joined to D111 by a large decorative arch. It has apartments, a garden apartment and a duplex.
Last updated:
Concrete structure
Concrete for the top floor was pumped into place, and every load was tested for quality.
Concrete structure
Concrete trucks bring ready-made concrete to the site to finish the building's structure.
Our specifications
Our sales team is ready to help you choose the right unit and arrange a site visit.
Leave your name and number and our sales team will call you, or chat with us on WhatsApp.
Contact us on WhatsApp